Companhia Vale Do Rio Doce (Vale) has recently issued the Provisional Acceptance Certificate for the Tenova Takraf Stacker installed at Ponta de Madeira Terminal, Brazil.

The Stacker machine, which has a 16000t/h nominal capacity and a 50m boom, has is installed at the stockyard of the Vale terminal at Ponta de Madeira.

The main structures of the Stacker was built in China in partnership with Timec, Tenova’s Chinese production facility, under Tenova experts’ supervision. Tenova Italimpianti do Brazil was in charge for the final assembly stage.